Project Length: 0.75 miles
Project Construction: 2007-2008
Construction Costs: $4.3 million
The existing steel Camelback bridge shown above is being relocated and preserved as a historical structure. The new bridge designed by CrossRoad Engineers will span 430 over the East Fork of the White River and be located about 750 upstream from the existing structure. Construction will begin in 2007 and include a new road alignment leading to the bridge.
|